MS Project | SOLO/DUO
Online 80.221.91.195:28015 checked 11m ago
Players
Every five minutes, from the Steam server list.
Hourly average and peak, UTC.
Daily average and peak, UTC.
Server performance
48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.
Rank
daily · 1 is bestTop 72% of all ranked servers. Ranked on player hours over the last seven days.
Wipe schedule
no rhythm it keepsIts wipes keep no rhythm, so there is no next wipe to predict. Every server wipes at the monthly force wipe.
The first 48 hours of its last wipes
Players each hour, from the hour of the wipe. The latest peaked at 0, 0 hours in.
Wipes
newest first| Wiped | Peak | Crowd | Lasted | Players before |
|---|---|---|---|---|
| Thu 15 Oct, 20:05 UTC2d ago | 0 | – | running | 0 |
| Sat 26 Sep, 09:07 UTC21d ago | 1 | halved by day 1 | 19.5 days | 1 |
| Thu 17 Sep, 20:03 UTC30d ago | 1 | halved by day 1 | 8.5 days | 0 |
Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.
Similar servers
the same kind of game, then region, group limit, rate and wipes
- 17/ 100
- 234/ 400
- 178/ 225
- 134/ 100
- 278/ 1000
- 22/ 700
Quick answers
Tags and search
Where does MS Project | SOLO/DUO appear in Rust Going Deep lists and filters?
These Rust Going Deep lists include MS Project | SOLO/DUO: Modded Rust servers. You can find it on the server list by these filters: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last 3 days.
How should you read the tags on MS Project | SOLO/DUO?
MS Project | SOLO/DUO's game browser tags read: gmrust (Game mode): Survival, as standard Rust does it; mp25 (Max players): The slot count is 25; ts8 (Group limit): The default team size of 8 applies here; v2633 (Protocol): The protocol is 2633; a different version won't get you in; cs162929 (Build): This server runs build 162929; ptrak (Networking): The network layer is RakNet, Rust's default; $r? (Region code): The region field is empty; ^z (Modded): Plugins or settings make changes, so it's listed as Modded; ^y (Carbon): This server relies on Carbon for plugins. The tags carry its player count right now, its queue and the world's age, and all three are displayed up top.
Server details
What's the performance like on MS Project | SOLO/DUO?
The last 48 hours saw an average of 238 server fps, never dropping below 222. The entity count reached a high of 69,548, covering buildings, deployables and everything else. Memory use peaked at 3,010 MB. What players notice as lag comes from low fps and a rising entity count.
What location is MS Project | SOLO/DUO in?
There is no published region for MS Project | SOLO/DUO. Rust Going Deep takes the server's word for its location and does not find out where the hardware sits. You can reach it at 80.221.91.195:28015.
How reliable is MS Project | SOLO/DUO?
Right now MS Project | SOLO/DUO is online. Its reported uptime shows a restart about 22 hours ago. In the last full 7 days, 52 of 168 hours were online, 31% uptime. 13 September 2026 is when Rust Going Deep first saw it.
What Rust version is MS Project | SOLO/DUO on?
On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. Steam handles the update; you just need your game on the matching protocol to join.
Wipe info
How often does MS Project | SOLO/DUO wipe?
There is no next wipe to predict because MS Project | SOLO/DUO wipes at irregular times. Next on Thursday 5 November at 19:00 UTC: the force wipe that all Rust servers take every month. 2 days 12 hours is how long ago this world came into being.
What can you expect on wipe day at MS Project | SOLO/DUO?
Across its recent wipes, the average busiest point drew 1 players. 0 hours after the latest wipe started, the crowd hit its peak. Above half that peak until the next wipe: the crowd managed this in 0% of recent wipes. By day 1, the pop had dropped under half.
Rules and settings
What settings are in place on MS Project | SOLO/DUO?
The name of MS Project | SOLO/DUO contains no gather rate. The group limit is the game's default of 8 players. It runs survival, gather, build and raid, the standard game. Fighting and raiding between players is allowed. Plugins or settings change the game, so the browser lists it as Modded. Carbon plugins are running here. VAC, Valve's anti-cheat, is enabled.
What's the map on MS Project | SOLO/DUO?
MS Project | SOLO/DUO uses a procedural map of size 3,500 with seed 150644954, made by the game. RustMaps can display it from this page because the same size and seed yield the same map.
Population
What's the population like on MS Project | SOLO/DUO?
Right now 0 players are on MS Project | SOLO/DUO, which has 25 slots. Across the last seven days, the typical count has been 0 players.
What position does MS Project | SOLO/DUO hold in the server rankings?
Over the last seven days, MS Project | SOLO/DUO is #15,843 by player hours, among the top 72% of all ranked servers.
Join info
How do you get into MS Project | SOLO/DUO?
Use Launch Rust on this page to open Rust through Steam and connect, or start Rust, press F1 and enter client.connect 80.221.91.195:28015.